If you don’t have your water meter yet, there is no need to panic.
Neptune has stopped the installation process in Dryden for 2010, but is set to resume work on January 5th.
The City was hoping to have 900-water meters installed at this point, however Neptune has been able to install 1,060.
If you don’t install a meter, the flat rate will double after March 31st.
Water Meter Installation Update
Do you have a news tip?
Submit to ONNews@radioabl.ca.

